Fanuc Power Mate i-D/H Operation Maintenance Handbook

7. HARDWARE
205
Primary Secondary
Tertiary
and sub-
sequent
operation
Explanation
Normal condition
When completing setting and maintenance operation, be sure to
set the rotary switch to this position.
Setting for connection to a setting/display unit other than the CRT/
MDI
Cancels settings. (All the numbers selected as
explained below are canceled.) Default
Switching between HSSB synchronization/non
synchronization
The Power Mate starts asynchronously regardless
of the PC status even when the HSSB board is
connected.
Connection to the handy operators panel
To connect the handy operators panel, set this
number. Then, the CRT/MDI can no longer be
connected.
Use of the DPL/MDI operation package (for boot
operation) on RS232C channel 2
D Set this number only when the system cannot
start normally, and boot operation or memory
clear operation must be performed using the
DPL/MDI operation package.
D This setting is maintained even after the power
is turned off. When this setting needs to be
cleared, clear the setting by following the pro-
cedure explained in Subsection 7.9.6 after
system starts.
Reserved

Leave a Reply

Your email address will not be published. Required fields are marked *