Fanuc Power Mate i-D/H Operator Manual

2. FUNCTION TO SIMPLIFY
PROGRAMMING
PROGRAMMING
(For the Power Mate i–D/D2)
B–63174EN/03
182
This cycle performs high–speed peck drilling. It performs intermittent
cutting feed to the bottom of a hole while removing chips from the hole.
G73
G73 X_ Z_ R_ Q_ F_ ;
X_ : Hole position data
Z_ : The distance from point R to the bottom of the hole
R_ : The distance from the initial level to point R level
Q_ : Depth of cut for each cutting feed
F_ : Cutting feedrate
Initial level
q
q
q
d
d
Point R
Point Z
2.1.1
High–speed Peck
Drilling Cycle (G73)
Format

Leave a Reply

Your email address will not be published. Required fields are marked *