Fanuc Power Mate i-D/H Operator Manual

2. FUNCTION TO SIMPLIFY
PROGRAMMING
PROGRAMMING
(For the Power Mate i–D/D2)
B–63174EN/03
202
This cycle is used to bore a hole.
G88
G88 X_ Z_ R_ P_ F_ ;
X_ : Hole position data
Z_ : The distance from point R to the bottom of the hole
R_ : The distance from the initial level to point R level
P_ : Dwell time at the bottom of a hole
F_ : Cutting feed rate
P
Point R
Initial level
Point Z
Spindle stop
after dwell
Spindle CW
After positioning along the X–axis, rapid traverse is performed to point
R. Boring is performed from point R to point Z. When boring is
completed, a dwell is performed, then the spindle is stopped. The tool is
manually retracted from the bottom of the hole (point Z) to point R. At
point R, the spindle is rotated clockwise, and rapid traverse is performed
to the initial level.
Before specifying G88, use a miscellaneous function (M code) to rotate
the spindle.
When the G88 command and an M code are specified in the same block,
the M code is executed at the time of the first positioning operation. The
system then proceeds to the next drilling operation.
When a tool length offset (G43, G44, or G49) is specified in the canned
cycle, the offset is applied at the time of positioning to point R.
2.1.11
Boring Cycle (G88)
Format
Explanations

Leave a Reply

Your email address will not be published. Required fields are marked *