Fanuc Power Mate i-D/H Operator Manual

B–63174EN/03
1. GENERAL
OPERATION
301
Before operation is started, the automatic running check can be executed.
It checks whether the created program can operate the machine as desired.
This check can be accomplished by running the machine actually or
viewing the position display change (without running the machine) (See
Section V–5).
Remove the workpiece, check only movement of the tool. Select the tool
movement rate using the dial on the operators panel.
Tool
Table
Fig.1.4.1 (a) Dry run
Check the program by changing the rate specified in the program.
Tool
Feed rate specified by program :
100 mm/min.
Feed rate after feed rate override :
20 mm/min.
Workpiece
Fig.1.4.1 (b) Feedrate Override
1.4
TESTING A
PROGRAM
1.4.1
Check by Running the
Machine
Explanations
Dry run
(See Section V–5.4)
Feedrate override
(See Section V–5.2)

Leave a Reply

Your email address will not be published. Required fields are marked *