Pega 357 with 04PC Control Layout Drawings

This manual describes the tasks that the purchaser of a Pega 345 Queen must complete before calling A.E.S.I. (Amada Engineering and Service Incorporated) to complete the installation and operator training.

Pega 345 Queen with 04PC Control Layout Drawings

Do not apply power to the Pega 255 until an Amada Service Engineer is present and has instructed you to do so.

This manual describes the tasks that the purchaser of a Pega 255 must complete before calling Amada Service to complete the installation and operator training.

This manual describes the tasks that the purchaser of a Pega 244N must complete before calling the service organization to complete the installation and operator training.

The Pega 244N does not require a special foundation to perform as expected, however there are minimum requirements that an existing floor must meet in order to assure machine reliability and tool life.

When repositioning within a Confirmation zone the Confirmation Button must be pressed to initiate the reposition cycle, as the material clamps could collide with the repositioning cylinders.

The Pega 357 requires one electrical power source supplied to the Fanuc 04PC.

When lifting the machine, apply the wire rope sling to the hole at the top of the left and right frames, slowly lift and carry the machine to the location, and slowly lower the machine at the location.

Top