Cut Off the Power Line to Motor at Alpha (HV)i Series SVM Additional Manual Page 3

Additional Manual
4. Requirement
(1) Please monitor the state of the circuit by the contact “B”. In case the state of the circuit
is not monitored, there is a possibility that the motor is energized unexpectedly.
(2) This function does not satisfy the requirement for safety standard by itself. MTB should
compose the proper safety circuit according to the safety standard.
5. Interface of the connector
There are signals of the relay drive and the monitor in the connector “CN7”
(1) Location of the connector CN7
Connector for power line to motor: CZ2
Bottom view of SVM
Connector: CN7
(2) Specification of the connector CN7
Manufacturer tyco Electronics AMP
Specification D2100 series
Housing: 1-1318119-4
Contact: 1318107-1
(3) Pin assignment of the connector CN7
Name
Pin No.
Name
Pin No.
24V
B1 B2 B3 B4
24V DOFEXAS1 AS2
A1 A2 A3 A4
6. Specification of the coil and the contact “B” of Relay “K50”
Input voltage of the coil 20.4V-26.4V
Rating of the Contact DC30V/6A ( Resistance load)
TITLE
DRAW.
No.
2 / 3
Page
FANUC LTD
DESCRIPTION DESIGN DATE
EDIT
Cut off the power line to motor
at Alpha(HV)i series SVM
A-72562EN-0025
1
st
. edition Hirai 03.02.26 01

Contents Summary of Cut Off the Power Line to Motor at Alpha (HV)i Series SVM Additional Manual

  • Page 1TECHNICAL REPORT(MANUAL) NO.TMS 03/009E Date 2003/02/28 General Manager of Servo Laboratory Function of interception of the power line to motor at Alpha(HV)i series SVM 1. Communicate this report to: Your information only GE Fanuc-N, GE Fanuc-E FANUC Robotics MILACRON Machine tool builder Sales agen
  • Page 2Function of interception of the power line to motor at Alpha(HV)i series SVM 1. Overview So far the external MCC has been necessary to cut the power to motor of the each axis. The power to the motor can be cut by this function instead of connecting external MCC. 2. Applied SVM (1) SVM1-10HVi: A06B-6
  • Page 34. Requirement (1) Please monitor the state of the circuit by the contact “B”. In case the state of the circuit is not monitored, there is a possibility that the motor is energized unexpectedly. (2) This function does not satisfy the requirement for safety standard by itself. MTB should compose the
  • Page 47. Notice (1) The dummy connector to shorted CN7-A1 and CN7-A2 is inserted at shipment. When you do not use this function, the dummy connector must be inserted. In case you put off the dummy connector, the motor can not be operated. (2) Please take care not to short 24V. Cut off the power line to mo