
Design Ed.
Approve
Design
page
Title
Draw.
No.
9/16
Description
FANUC Series 30i-MODEL A
Small-Hole Peck Drilling Cycle
A-79414E
Feb. 23, 2004
Date
Date
2.1 Small-Hole Peck Drilling Cycle
General
In peck drilling, the tool enters and retracts from hole based on an
overload torque detection signal (skip signal) until the designed hole
depth is reached. The spindle speed and cutting feedrate are changed on
each entry of the hole.
The cycle is realized by:
* X- and Y-axis positioning
* Positioning at point R along the Z–axis
* Cutting along the Z-axis (first time, depth of cut Q, incremental)
Retracting
(bottom of hole → minimum clearance ∆, incremental)
Retraction
( bottom of hole+∆→ to point R, absolute)
Forwarding
(point R → to point with hole bottom + clearance ∆, absolute)
Cutting
(second and subsequent times, cut of depth Q + ∆, incremental)
* Dwell
* Return to point R along the Z-axis (or initial point) = end of cycle
G83 (G98) G83 (G99)
Change of cutting conditions
The cutting conditions are changed at each pecking operation (forwarding →
cutting → retracting) during one G83 cycle. Bits 1 and 2 of parameter
No. 5160 affects the cutting conditions.
- Changing of cutting feedrate
The cutting feedrate programmed with the F word is changed during the
second and subsequent cutting operations. Parameter Nos. 5166 and 5167
specify the ratio of change for the case in which a skip signal was received
∆
∆
∆
Point R Point R
Point Z
Q
Initial level
Dwell
Overload torque
Point Z
Q
Dwell
Overload tor
ue
Point R level
∆
Repeated until
oint Z is reached