
Design Ed.
Approve
Design
page
Title
Draw.
No.
5/16
Description
FANUC Series 30i-MODEL A
Small-Hole Peck Drilling Cycle
A-79414E
Feb. 23, 2004
Date
Date
Note
When receiving overload torque detect signal while the
tool is advancing, the tool will be retracted (clearance ∆
and to the point R), then advanced to the same target
point as previous advancing.
- Changing the drilling conditions
In a single G83 cycle, drilling conditions are changed for each drilling
operation (advance → drilling → retraction). Bits 1 and 2 of parameter OLS,
NOL No. 5160 can be specified to suppress the change in drilling conditions.
1 Changing the cutting feedrate
The cutting feedrate programmed with the F code is changed for each
of the second and subsequent drilling operations. In parameters
No.5166 and No.5167, specify the respective rates of change applied
when the skip signal is detected and when it is not detected in the
previous drilling operation.
<First drilling> α=1.0
<Second or subseqent drilling> α=α×β÷100, where β is the rate of
change for each drilling operation
When the skip signal is detected during the previous drillingoperation:
β=b1% (parameter No.5166)
When the skip signal is not detected during the previous
drillingoperation: β=b2% (parameter No.5167)
If the rate of change in cutting feedrate becomes smaller than the rate
specified in parameter 5168, the cutting feedrate is not changed.
The cutting feedrate can be increased up to the maximum cutting
feedrate.
2 Changing the spindle speed
The spindle speed programmed with the S code is changed for each of
the second and subsequent advances. In parameters 5164 and 5165,
specify the rates of change applied when the skip signal is detected and
when it is not detected in the previous drilling operation.
<First drilling> γ=1.0
<Second or subseqent drilling> γ=γ×δ÷100, where δ is the rate of
change for each drilling operation
When the skip signal is detected during the previous drilling operation:
δ=d1% (parameter No.5164)
When the skip signal is not detected during the previous drilling
operation: δ=d2% (parameter No.5165)
Cutting feedrate =F×α
Spindle speed =S×γ