
B–62073E–1/042. INTERFACE BETWEEN CNC AND PMC–NA OR NB
– 208 –
1508 SPSYC3 SPSYC2 SPSYC1 SPSYC0
#7 #6 #5 #4 #3 #2 #1 #0
Data No. Data
Spindle synchronization control processing sequence/other data
SP
SYC3
SP
SYC2
SP
SYC1
SP
SYC0
Status of internal processing
0 0 0 0
Mode is not spindle synchronization control mode
(waiting for SPSYC = 1)
0 0 0 1
Waiting for clearing synchronization arrival speed
(during spindle speed synchronization control)
0 0 1 0 Waiting for setting synchronization arrival speed signal
0 0 1 1
Waiting for completion of spindle speed synchronization
and spindle phase synchronization command
(waiting for SPPHS = 1)
0 1 0 0 Phasing ON / OFF
0 1 0 1
Waiting for clearing synchronization arrival speed signal
(during spindle phase synchronization control)
0 1 1 0 Waiting for setting synchronization arrival speed signal
0 1 1 1 Spindle phase synchronization completed
1509 1st spindle motor error pulse amount at spindle synchronization control
Data No. Data
Number of error pulses for the motor for spindle 1 during spindle sequence control
Unit: Pulses
1510 2nd spindle motor error pulse amount at spindle synchronization control
Data No. Data
Number of error pulses for the motor for spindle 2 during spindle sequence control
Unit: Pulses
1511 Error pulse difference between spindles at spindle synchronization control
Data No. Data
Difference in the number of error pulses between the two spindles during spindle sequence con-
trol
Unit: Pulses
(5) FANUC Series 15 (multiaxis)
The multiaxis FS15 shares all parameters, their setting methods, alarms, DI/DO signals, and their address-
es with the standard FS15 except for the following:
i) Serial interface spindle connection method
ii) Axis allocation method for the Cs contour control function
iii) Restrictions in relation to other functions