
B-70265EN/02 INDEX
i-3
PARAMETERS FOR EDGE MACHINING
CONDITIONS ..............................................................270
PARAMETERS FOR ENABLING/DISABLING
VARIOUS FUNCTIONS..............................................260
PARAMETERS FOR GAS CONTROL (1)..................290
PARAMETERS FOR GAS PRESSURE
CONTROL (2) ..............................................................303
PARAMETERS FOR HIGHLY REFLECTIVE
MATERIAL ALARMS................................................. 293
PARAMETERS FOR HIGH-SPEED PIERCING
CONDITIONS ..............................................................274
PARAMETERS FOR LASER MAINTENANCE
TIMING INDICATION FUNCTIONS .........................282
PARAMETERS FOR LASER POWER /
VOLTAGE DROP ........................................................294
PARAMETERS FOR PIERCING CONDITIONS .......273
PARAMETERS FOR POWER CONTROL .................276
PARAMETERS FOR POWER TABLE SETTING......295
PARAMETERS FOR THE OSCILLATOR.................. 284
PARAMTER LIST........................................................259
Parts run time display....................................................224
PCB...............................................................................186
PERIODIC MAINTENANCE ........................................59
Phase rotation..................................................................42
Placement Numbers.......................................................138
Power cable connection...................................................41
POWER CALIBRATION METHOD ...........................216
POWER CONTROL (2) ...............................................300
POWER FEEDBACK BASED ON THE ACTUAL
OUTPUT ESTIMATION METHOD ............................304
POWER FEEDBACK FUNCTION BASED ON
THE ACTUAL OUTPUT ESTIMATION METHOD... 231
POWER SENSOR UNIT..............................................184
Power Supply Cannot Be Switched Off Using
CRT/MDI Switch ............................................................ 96
Power Supply Cannot Be Switched On Using
CRT/MDI Switch ............................................................ 96
Power Supply Checking..................................................42
Power Supply Margin Check (Pulse Check) ...................51
Preparation ....................................132, 206, 209, 212, 214
PREPARATION PRIOR TO SHIPMENT......................54
PRESSURE CONTROL UNIT (C2000-E, C4000-E)...166
Procedure ......................................................................214
Pure Water Supply Unit ..................................................35
<R>
Reinstalling a Fittings............................................314, 315
Removing Cooling Water................................................55
Replacement Method...60, 62, 63, 129, 137, 139, 140, 141
.......154, 156, 159, 170, 171, 178, 180, 181, 184, 185, 188
Replacing a Fan Unit.....................................................182
Replacing a Fan-assisted Radiator.................................182
Replacing a high-speed diode........................................130
Replacing an FET module PCB ....................................131
Replacing the charge unit..............................................159
REPLACING THE DEW SENSOR..............................185
Replacing the exhaust unit ............................................159
Replacing the IF PCB....................................................186
Replacing the Input Control PCB..................................186
Replacing the Intermediate PCB B................................187
Replacing the laser gas cylinder ......................................34
Replacing the power supply unit ...................................129
Replacing the shutter mirror..........................................178
Replacing the shutter switch
(thermal and photoelectric switches).............................179
Replacing the shutter unit..............................................178
Replacing the Stabilized Power Supply.........................186
Replacing the Turbo PCB .............................................187
REPLACING THE WATER DISTRIBUTION UNIT ..171
RESPONDING TO ALARM MESSAGES ON
THE SCREEN.................................................................72
<S>
SAFETY PRECAUTIONS.............................................s-1
Setting a Power Input Compensation Coefficient..........216
Setting the atmospheric pressure sensor................160, 168
Setting the frequency of the power supply of the hour
meter................................................................................42
Setting the gas supply pressure sensor ..................160, 168
SHUTTER UNIT ..........................................................178
Specification of the cooling water...................................35
SPECIFICATIONS .......................................................243
<T>
Tightening a Fittings .............................................314, 315
Time constant measurement method .............................233
TRIGGER ELECTRODE..............................................140
TRIGGER PULSE COMMAND CONTROL
FUNCTION...................................................................236
TROUBLESHOOTING ..................................................70