
10.REPLACEMENT PROCEDURES B-70255EN/01
- 162 -
10.10 REPLACING A DISCHARGE TUBE
When a discharge tube is replaced, the gas circulating system is open
to the atmosphere for a long time. Pay particular attention to the
immediate surroundings to ensure that dust and other contaminants do
not enter the gas circulating system.
(1) Turn off the power to the CNC, then turn off the power to the
laser oscillator.
Remove the top cover of the oscillator.
(2) Detach the cable connecting the discharge tube with the
matching box, by loosening the thumbscrew.
Remove all the screws from the flange which secures the
discharge tube (six screws are used for each discharge tube).
(3) Move the discharge tube toward the output, rear, and folding
mirrors, while rotating it. If the O-ring is too tight to allow the
discharge tube to be moved, lubricate the O-ring with alcohol.
Before attempting to move the discharge tube, however, move
the flange to the center of the tube. Then, hold the supported end
of the discharge tube, leaving a gap of 5 mm, then push the
discharge tube while rotating it. At this time, be careful not to
damage the end of the discharge tube. If the discharge tube is
damaged, glass chips may enter the gas circulating system.
(4) Move the O-ring to the center of the discharge tube, then remove
the discharge tube. If the O-ring is at the end of the discharge
tube, the end of discharge tube may be damaged while it is being
removed.
(5) Remove the copper plate from the removed discharge tube, then
mount it on a new discharge tube.
(6) Mount the flange on the new discharge tube, then mount the O-
ring. Before mounting the O-ring, wipe it with alcohol. A Teflon
O-ring is hard, and must be expanded slightly (by hand) before
being mounted. The surface of the O-ring may exhibit cracks or
some white deposits, indicating deterioration. Such an O-ring
may cause gas leakage or generate dust. Replace it with a new
one.
(7) Insert the new discharge tube into the discharge tube holder by
reversing step (5), then perform assembly by reversing steps (5)
and (6).
(8) Turn on the oscillator, then perform a gas leakage check.