E.CONTROL SEQUENCES IN LASER OSCILLATOR APPENDIX B-70255EN/01
- 248 -
[SQ16, 17, 18]
Setting the laser start switch to ON starts evacuation, which continues
until the pressure designated by PRM No. 15240 is reached. After
evacuation up to the value set in PRM No. 15240, gas pressure
control starts. Then, the pressure increases to the value set in PRM No.
15241. When 45 seconds has elapsed after gas pressure control starts,
a check is made to see if the intra-tube gas pressure is within ?20
relative to the value of PRM No. 15241. If the intra-tube gas pressure
is not within this range, an alarm is issued. If there is no problem, the
turbo blower starts and reaches the specified speed in about 70
seconds. Then, LRDY is set to 1 to set the discharge start preparation
completion state. If the frequency reached signal is not issued by the
inverter within 120 seconds of the turbo blower being started, an
alarm is issued.
[SQ20]
This is the state of discharge start preparation completion (LRDY=1)
and HV ON (high voltage command) is read.
[SQ26, 27, 28]
When HV is turned on in the discharge start preparation completion
state, a high voltage is applied to the discharge tube to generate the
base discharge state. At the same time, gas pressure control is
exercised. The intra-tube gas pressure increases from the value of
PRM No. 15241 to the value set in PRM No. 15242 or 15243. At this
time, a check is made to see if the intra-tube gas pressure is within
100 relative to the value of PRM No. 15242 or 15243. If the intra-tube
gas pressure is not within this range, an alarm is issued. If there is no
problem, an output compensation coefficient calculation is made.
[SQ30]
This is oscillation preparation completion state(LSTR=1) in which
laser oscillation is ready.
[SQ23]
When HV is turned off, discharge stops, and the state changes from
the oscillation preparation completion state (LSTR) to the discharge
start preparation completion state (LRDY). At this time, the intra-tube
gas pressure changes from the value set in PRM No. 15242 or 15243
to the value set in PRM No. 15241.
[SQ49, 14, 12]
When the oscillator start switch is set to OFF in the SQ20 state, gas
pressure control ends, and the termination of the turbo blower
operation is awaited for 70 seconds. If evacuation is enabled (bit 2 of
PRM No.15003 = 1) after RUN is turned off, evacuation is performed
for the period of time set in PRM No.15256, Then, laser gas is filled
until the intra-tube gas pressure becomes equal to the atmospheric
pressure. Upon completion of laser gas filling, the purge state is set.
When the purge state is set, the off-interlock contact is disconnected.