3.START-UP PROCEDURE START-UP PROCEDURE FOR βi SVPM B-65325EN/01
- 72 -
3.2 CONNECTING THE POWER
3.2.1 Checking the Voltage and Capacity of the Power
Before connecting the power, you should measure the AC power
voltage.
Table 3.2.1(a) Action for the AC power (200-V input type)
Permissible
voltage
fluctuation
width
Nominal
voltage
Action
-15%
+10%
3-phae
200 to 240V
Permitted.
Note) If the voltage is below the rated value,
the rated output may not be obtained.
-15%
+10%
380 to 550V
Not permitted.
This power line must be connected through
an insulation transformer to step down the
voltage to 200 V.
Table 3.2.1 (b) list the input power specification for the power supply
module. Use a power source with sufficient capacity so that the system
will not malfunction due to a voltage drop even at a time of peak load.
Table 3.2.1 (b) AC power voltage specifications (200-V input type)
Model
SVPM2-
-5.5i
SVPM3
-5.5i
SVPM2
-11i
SVPM3
-11i
SVPM2
-15i
SVPM3
-15i
Nominal voltage rating 200 to 240VAC -15%,+10%
Power source frequency 50/60Hz ±1Hz
Power source capacity (for
the main circuit) [kVA]
9 17 22
Power source capacity (for
the control circuit)
24V 1.5A ±10%
3.2.2 Connecting a Protective Ground
Check that the protective ground line is connected correctly.
3.2.3 Selecting the Ground Fault Interrupter That Matches the
Leakage Current
Check that a correct ground fault interrupter is selected.