
11. OPTION RELATED TO SPINDLE
B–65162E/03
488
NOTE
Refer to the following CNC manuals as well:
Section 9.12 of FS 16/18/21i Connection Manual
(Function) (B–63003EN–1)
Section 9.12 of FS 16/18 Connection Manual (Function)
(B–62753EN–1)
(1) DI Signals (PMC to CNC)
(a) Signal address
#7 #6 #5 #4 #3
SPPHS
#2
SPSYC
#1 #0
G146 G146 G038
FS0–T FS0–TT FS15 FS16 FS16–TT
Head2 Head2
R08I R07I R06I R05I R04I R03I R02I R01I
G124 G124 G032
SSGN R12I R11I R10I R09I
G125 G125 G033
RI07 RI06 RI05 RI04 RI03 RI02 RI01 RI00
G025
RISGN RI12 RI11 RI10 RI09 RI08
G024
SPPHS SPSYS
G111
SFRA SRVA CTH1A CTH2A
1st : G229 G1429 G227 G070 G1070
INTGA
SFRB SRVB CTH1B CTH2B
INTGB
1st : G230 G1430 G226 G071 G1071
2nd : G233 G235 G074
2nd : G234 G234 G075
(b) Signal for spindle synchronization control (SPSYC)
[Function] Selects the spindle synchronization control mode.
[Operation] When the signal is set to 1, spindle synchronization control mode is
selected.
When the signal is set to 0, spindle synchronization control mode is
released.
(c) Signal for spindle phase synchronization control (SPPHS)
[Function] Selects the spindle phase synchronization mode. It becomes effective
when the signal for spindles synchronization control (SPSYC) is set to 1.
Enter this signal after the signal that indicates that synchronization
control of spindle speed is completed has been set to 1. Synchronization
control of spindle phase is started at the rising edge of this signal. Even
when this signal is set to 0, the synchronized phase does not change.
When the signal is changed again from 0 to 1, phase synchronization is
executed again.
[Operation] At the rising edge of the signal changing from 0 to 1, synchronization
control of the spindle phase begins.
11.4.4
DI/DO Signals