
B–62075E/04
4. INTERFACE BETWEEN NC AND PMC
269
PMC address
Signal nameSymbol
For TT series
For M series and
T series
Signal nameSymbol
HEAD#2HEAD#1
For M series and
T series
Signal nameSymbol
WHEAD Signal for selecting a tool post for NC
window input/output
G111.0
WN1,2,4,8,16 External workpiece number search
signals
G019.0 to 4 G019.0 to 4 G067.0 to 4
WOQSM Signal for selecting the mode for writ-
ing the shift distance for the workpiece
G028.6 G028.6 G076.6
WOSET Signal for writing the shift distance for
the workpiece coordinate system
G026.7 G026.7 G074.7
ZD1 to 10 Reference Point Approach Signal/Ar-
rival Signals
ZP1 to 10 Reference Point Return End Signals F064.0, F068.0
to F100.0
F128.0, F132.0
to F164.0
ZP21 to 210 2nd Reference Point Return End Sig-
nals
F064.1, F68.1
to F100.1
F128.1, F132.1
to F164.1
Z
ZP31 to 310 3rd Reference Point Return End Sig-
nals
F064.4, F068.4
to F100.4
F128.4, F132.4
to F164.4
ZP41 to 410 4th Reference Point Return End Sig-
nals
F064.5, F068.5
to F100.5
F128.5, F132.5
to F164.5
ZRN Manual Reference Point Return Selec-
tion Signal
G002.7 G098.7
ZRNO Manual reference position return
selection signal of software operator‘s
panel
F128.7
Nu-
me
ric
3DM Signal indicating that three–dimension-
al coordinate conversion is in the
manual
F157.5
without symbol Key input G128 to G139
Signals for specifying a speed in PMC
axis control
See the description of PMC axis control.