B–61863E/15
3. CONFIGURATION AND OPERATION
OF STEP–SEQUENCE
PROGRAMS
STEP SEQUENCE FUNCTION
997
A block step specifies the step sequence subprogram to be executed.
[Display]
]
Sn
(Pm)
[Contents]
Define a step number (Sn), which controls the execution of a bloc
step, and a sub–program (Pm) specifying the actual process, for a
block step.
CAUTION
Assign a step number to a block step.
The same step number cannot be used twice in a program.
A transition must be placed after a block step.
Example)
Transition P102 cannot be omitted due to the syntax of the step sequence method. Specify
a dummy transition, which becomes always true, for transition P102.
Transition P121 must specify the transition condition for the termination of the step S21.
When the conditions of transitions P102 and P121 are switched, step S21 will not be correctly
executed.
]
S1
P101
S2
(P2)
P102
S3
P2
S20
P120
S21
P121
equal
S1
S3
S20
P120
S21
P121
P101
3.10
BLOCK STEP